What is the process of drilling a water well?

The general process of drilling a water well is as follows:

1. Determine the well location:

Determine the location of the well drilling according to the geological conditions and water demand.

2. Prepare equipment and materials:

Transport the equipment and materials required for well drilling to the site.

3. Drilling:

Use drilling rigs to carry out drilling operations.

4. Lowering well pipe:

Lowering the well pipe into the well section by section. 

5. Gravel Filling:

Filling gravel between the well pipe and the wall of the well.

6. stopping water:

Perform water stopping operations to prevent water infiltration.

7. washing the well:

Cleaning the well of impurities and mud.

8. pumping test:

Testing the quantity and quality of water produced from a well.